Megger Report docs

Searching:
Download
Megger Report - Fast Download

Download Megger Report from our fatest mirror

Test Reports Template - HHS

7531 dl's @ 8905 KB/s

doc
Test Reports Template - HHS

Changes to this Test Report will be coordinated with and approved by the undersigned or their ... Test Reports Template Subject: Author: HHS EPLC Team Keywords:

http://www.hhs.gov/ocio/eplc/EPLC%20Archive%20Documents/46-Test%20Reports/eplc_test_reports_template.doc

Date added: August 18, 2016 - Views: 17

doc
26 08 30 (16972) - Electrical Starting and Testing...

Section 26 08 20 - Electrical Starting and Testing by Contractor. ... Note data on test report form..2 Megger test all insulators to ground.

http://www.infrastructure.alberta.ca/Content/docType486/Production/26_08_30B.doc

Date added: August 19, 2016 - Views: 1

doc
Medium Voltage Power System Maintenance - Alberta

Record data on test report form..2 Megger test insulators to ground..3 Megger test bussing phase to ground, ... Medium Voltage Power System Maintenance ...

http://www.infrastructure.alberta.ca/Content/docType486/Production/26_13_90_PMS.doc

Date added: August 18, 2016 - Views: 4

doc
Torque Testing Request Form -...

Torque Testing Request Form. Instructions: Please complete the form by highlighting and filling in the gray cells below. Include as much information as you feel is ...

http://www.engineeringfasteners.com/pdf/torque_testing_request_form_rev_aug_07.doc

Date added: August 18, 2016 - Views: 2

doc
assets.tequipment.net

Megger’s MIT420 Insulation Resistance and Continuity Tester has been the instrument of choice of Lou Iaconelli. ... Transfer this data to the customer report.

http://assets.tequipment.net/assets/1/26/Documents/Megger/MIT430_EN/mit430_en_doc_5.doc

Date added: September 8, 2016 - Views: 1

doc
CENTER OPERATIONS AND MAINTENANCE SERVICES...

Only the report forms are provided, ... All inspections and maintenance must be as per Annual Inspection / Maintenance Repair of ... Actual Megger. Insulation. Current.

https://faaco.faa.gov/attachments/Draft-ATT_II_SEC_05_ELECTRICAL.doc

Date added: August 18, 2016 - Views: 3

doc
PACIFIC GULF MARINE, INC. - Department of...

A survey report attesting to the suitability of the above shall be submitted to the PGM ... Open and disconnect motor leads and megger. Report results to the Port ...

https://voa.marad.dot.gov/docs/Library/ship_manager/docs/Group%2016/DEACT%20SPEC%20PGM%20TACS.DOC

Date added: August 19, 2016 - Views: 1

doc
TEST SPECIFICATION TEMPLATE

RTMx Report (RTMx) or Use Cases ... TEST SPECIFICATION TEMPLATE Author: USPTO Last modified by: Elaine Greene Created Date: 2/12/2009 2:01:00 PM Company: Galaxy ...

http://www.uspto.gov/about/vendor_info/current_acquisitions/sdi_ng/test_specifications_procedures.doc

Date added: August 18, 2016 - Views: 2

doc
SECTION 16117 - FRDF TESTS - FAACO - Federal...

SECTION 16117 - FRDF TESTS. PART 1 ... These tests shall be completed using a 500V megger. ... The results shall be submitted to the COTR in a “separate” report ...

http://faaco.faa.gov/attachments/0700346_specs_9.doc

Date added: August 26, 2016 - Views: 1

doc
piyushpanchal2007.mynetworksolutions.com

-Cable megger report (primary prior to pulling)-Cable megger report (secondary after pulling)-Pressure test record(TR)-MC check record (remote loop)(green color)

http://piyushpanchal2007.mynetworksolutions.com/images/Inst._Insp._and_Qua._Con..doc

Date added: August 26, 2016 - Views: 1

doc
secure1.mhhs.org

SECTION 26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS. PART 1 - GENERAL. 1.01 WORK INCLUDED. A. Comply with the provisions of Sections 260500. B. Provide a ...

https://secure1.mhhs.org/engineering_bestpractices/Master_Specs/Electrical/26%2005%2019%20Low%20Voltage%20Electrical%20Power%20Conductors.doc

Date added: August 23, 2016 - Views: 1

doc
www.lowellma.gov

Report sheets for Megger testing. DELIVERY, STORAGE, AND HANDLING. Deliver wire and cable properly packaged in factory fabricated type containers, or wound on NEMA ...

http://www.lowellma.gov/Purchasing/Lists/Solicitations/Attachments/151/16120%20Wire%20and%20Cables.DOC

Date added: August 22, 2016 - Views: 1

doc
Radio Technicians Survey slr/gmdss - ww2.eagle.org

Associated REPORT NO. DATE RADIO TECHNICIANS SURVEY. ... For NIS ships, transmitting results to be tested with MEGGER: MEGOHM (>50 MOHM dry, >5 humid) 7.

http://ww2.eagle.org/content/dam/eagle/forms/GMDSS-TECH.doc

Date added: August 22, 2016 - Views: 1

doc
METEOR phase IV procedure - Department of...

phase iv procedures. 0000-00-ar-g general notes and comments. preamble: these instructions are intended to provide core maintenance procedures for vessels in phase iv ...

https://voa.marad.dot.gov/docs/Library/ship_manager/docs/Group%2015/METP4ROS.DOC

Date added: August 26, 2016 - Views: 1

doc
Electrical Systems Prefunctional Checklists and...

The report shall contain infrared photos of trouble spots ... MD Anderson Cancer Center electrical systems prefunctional checklists and start-ups 26 08 13 ...

http://www2.mdanderson.org/depts/cpm/standards/specs/div26/26%2008%2013.doc

Date added: August 18, 2016 - Views: 6

doc
INTERNATIONAL MARITIME BUREAU - ubsho.com

(Megger test report to be included) NONE This is to declare that the undersigned has examined and filled all the items of this report before signed it. Based ...

http://www.ubsho.com/download/PSR-SURVEY%20REPORT/MA-REP-IN.doc

Date added: August 26, 2016 - Views: 1

doc
Meeting Agenda - engr.siu.edu

Design Report. Requirements. ... Appendixes. Megger Test. High Potential. Elsco Instruction Manual. Nameplate of A transformer. Non Standard Transformer relationships ...

http://www.engr.siu.edu/ugrad1/me495a/OUTGRESP/F08-72-Meeting_Agenda_3-26-09.doc

Date added: August 26, 2016 - Views: 1

doc
SURVEY REPORT ON SOLAS GMDSS - ubsho.com

SURVEY REPORT ON SOLAS GMDSS. RADIO TECHNICIAN’S SURVEY. ... .For NIS ships, transmitting results to be tested with MEGGER:_____ MEGOHM (>50 MOHM dry, ...

http://www.ubsho.com/download/OMCS/Report/CRC-01.doc

Date added: August 20, 2016 - Views: 1

doc
Commissioning Sequence Progress Check Sheet

Report Submitted and Approved (cable megger; Grounding) _____ _____ O & M Manual (Final) Submitted _____ _____ Training Scheduled and Completed ...

http://www.umaec.umich.edu/wp-content/uploads/2013/10/Electrical-Power-Sys.doc

Date added: August 26, 2016 - Views: 1

doc
Contractor and its employees and - Judiciary of...

... HKA Vertical Transportation Modernization Specifications, Exhibit I, Asbestos Reinspection Report, and ... that was in the AOC’s solicitation document.

http://www.courts.ca.gov/documents/OCCM-2012-01-CC-ATTACHMENT-4.docx

Date added: August 19, 2016 - Views: 1

doc
Outline of Final Report - National Transportation...

FINAL REPORT. January 31, 2005. ... an ITS implantation plan is defined as a document that outlines a series of system operations and ... With a MEGGER meter, ...

http://ntl.bts.gov/lib/25000/25000/25039/ITS_Operational_Support-Final_UTRC.doc

Date added: August 20, 2016 - Views: 1

doc
www.courts.ca.gov

Provide a megger insulation test report of all field coils and armature windings; the megger reading to be a minimum of 500,000 ohms. Commutator: ...

http://www.courts.ca.gov/documents/OCCM-2012-01-CC-ATTACHMENT-2.docx

Date added: August 19, 2016 - Views: 2

doc
PART 1 GENERAL - GE Industrial

Inspect and report concealed damage to carrier within ... Megger and record readings for phase to phase, phase to ground. Individual lengths should be at least ...

http://apps.geindustrial.com/publibrary/checkout/1995%20CSI%20Master%20Format|16467|generic

Date added: August 18, 2016 - Views: 1

doc
TESTING PROCEDURES - University of Kentucky

Megger all cables and record the readings before and after the ... Measure temperature and humidity before the Hi Pot Test and include these reading on the Test Report.

http://www.uky.edu/cpmd/download/file/fid/614

Date added: September 29, 2016 - Views: 1

doc
ETE-01-01: FORM 1 – RAIL BREAK REPORT

INSULATION TEST RECORD – POWER FEEDERS Calibration Date: Circuit Book Name: Circuit Book No: Megger Type: Serial No: / / Cable Material: Cable Size: Meter ...

https://extranet.artc.com.au/docs/eng/signal/forms/maintenance/SMP23F-03.doc

Date added: August 31, 2016 - Views: 1

doc
PART 1 – GENERAL - Hammond Power Solutions

Type Test each model design and submit report. ... (Megger) test. Positive sequence impedance. No load and full load losses in watts. Sound level in decibels.

http://www.hammondpowersolutions.com/files/HPS_Spec_1.2kV_Eff_Distribution_Transformer.doc

Date added: August 20, 2016 - Views: 1

doc
Westinghouse Proprietary Class 2 - Rensselaer at...

Review of Pressurized Water Reactor Pressurizer Heater Operating Experience. by . Daniel B. Denis. An Engineering Project Submitted to the Graduate

http://www.ewp.rpi.edu/hartford/~denisd2/EP/Other/draftNov24/FinalDraftNov24am.doc

Date added: August 18, 2016 - Views: 1

doc
ETE-01-01: FORM 1 – RAIL BREAK REPORT

INSULATION TEST RECORD – TRACK CIRCUIT LOCALS Calibration Date: Circuit Book Name: Circuit Book No: Megger Type: Serial No: / / Cable Material: Cable Size ...

https://extranet.artc.com.au/docs/eng/signal/forms/maintenance/SMP23F-05.doc

Date added: August 26, 2016 - Views: 1

doc
www.umaec.umich.edu

Submit a test report. ... The Megger test shall be performed for 15 seconds or until the insulation resistance value stabilizes.

http://www.umaec.umich.edu/for.archs/masterspec/26/MS260513.docx

Date added: August 27, 2016 - Views: 1

doc
ELECTRONICS 102 DC - Heartland Community College

Inductors Reactance include report and excel graph # 21-1. Inductive circuits include report . 4 ... Megger Lab if time allows. Relay Lab using the microcontroller. 4 ...

http://www.technology.heartland.edu/faculty/chrism/ac%20dc/Spring%202011%20ELTC%20103%20schedule.docx

Date added: September 29, 2016 - Views: 1

doc
ELECTRONICS 102 DC - Heartland Community College

Megger Lab if time allows. ... include report and excel graph. REPAIR LAB. 5-6-13. Lecture. ... ELECTRONICS 102 DC Last modified by: Miller, Chris

http://www.technology.heartland.edu/faculty/chrism/ac%20dc/Spring%202013%20ELTC%20103%20schedule.docx

Date added: September 29, 2016 - Views: 1

doc
HQ 112478 - U.S. Customs and Border Protection

March 30, 1993. VES-13-18 CO:R:IT:C 112478 GFM. CATEGORY: Carriers. Chief, Technical Branch. Commercial Operations. Pacific Region. 1 World Trade Center. Long Beach ...

http://rulings.cbp.gov/hq/1993/112478.doc

Date added: September 29, 2016 - Views: 1

doc
PART 1 – GENERAL - hammondpowersolutions.com

Type Test each model design and submit report. ... (Megger) test. Positive sequence impedance. Heat run test for K-factor rating compliance per UL & CSA.

http://www.hammondpowersolutions.com/files/sps08rev6.doc

Date added: August 18, 2016 - Views: 1

doc
Functional Operation - Commissioning

Commissioning agencies must develop functional performance test checklists for every system included within the scope of any commissioning project, ...

http://www.commissioning.org/documents/appendix%20d.doc

Date added: August 18, 2016 - Views: 3

doc
Flashover Performance of a Rod-rod Gap Containing...

A mutual project between Megger and TSV ... 1996 P. Illuzzi, “Abstract about measures on V-type OLTC Model”, TSV Lyon-Megger Sweden internal report, ...

http://www.seeei.org/EL2014/Papers/058.doc

Date added: August 26, 2016 - Views: 1

doc
Exhibit 01 91 13-5, Commissioning Process...

Issue Tracking Report ... megger testing and other similar tests. Training: Training is the responsibility of the Contractor for all equipment and systems.

http://www.fs.illinois.edu/docs/default-source/facility-standards/exhibits/exhibit-01-91-13-05-commissioning-process-definitions.docx?sfvrsn=2

Date added: August 27, 2016 - Views: 1

doc
Question - Seattle

SCL Megger Test Form. Test Specification and MEGGER Test Form. CAD Drawing Requirements . ... The report shall include a description of the tests to be performed, ...

http://www.seattle.gov/purchasing/docs/bids/ITBSCL1189A101813.doc

Date added: August 18, 2016 - Views: 2

doc
Westinghouse Proprietary Class 2 - Rensselaer at...

Because no subsequent reading was given in the report, it is assumed that the low megger reading might be an indication of potential sheath degradation.

http://www.ewp.rpi.edu/hartford/~denisd2/EP/Other/progressReport2/ProgressReport2(November).doc

Date added: August 27, 2016 - Views: 1

doc
www.dca.com.na

2.8 Is a copy of this report available? 2.9 Does the AMO have an update publications list? 2.10 Is the ... Megger. Tachometer Tester and Drives. Till Table. Spirit ...

https://www.dca.com.na/docs/Airworthiness/FSS-AIR-FORMS/FSS-AIR-FORM%20003O.doc

Date added: September 29, 2016 - Views: 1

doc
Condition Survey Report Form - iopai.com

Are cargo hoses regularly -- megger tested? ... Rev 2 10/2013 IOPAI Condition Survey Report Form Page 5 of 25. Title: Condition Survey Report Form Author:

http://www.iopai.com/userfiles/files/Indian%20Ocean%20Club%20-%20Condition%20Survey%20Report%20(Others).doc

Date added: August 20, 2016 - Views: 1

doc
DIRECTIVE 16-7 - State University Construction...

Megger testing may be done. Use ... Existing underground conduits and manholes shall be surveyed prior to design manual phase and a report submitted to SUCF. The ...

http://www.sucf.suny.edu/pdf/dir/16-7.doc

Date added: August 18, 2016 - Views: 1

doc
METHOD STATEMENT FOR - xa.yimg.com

METHOD STATEMENT FOR . ... (with the quantity mentioned in report) would be made to the KM material section. ... Megger / Clamp A.V.O.

http://xa.yimg.com/kq/groups/26854886/475930343/name/Method+Statement+overhead+power+line.doc

Date added: August 18, 2016 - Views: 4

doc
Polar Sea FY’05 PMA - icefloe

CONDITION FOUND REPORT. ... 3.0, 3.2: Dry out swivel enclosure, conduct megger testing of all wires to verify condition for further use. 2.3, 2.3.3, 3.4: ...

http://icefloe.net/files/CFR_4015-057_Allied_Systems_Crane_Reports(Resp)%5b1%5d.doc

Date added: September 3, 2016 - Views: 1

doc
www.ehs.berkeley.edu

Commission and submit the report to CFM prior testing. Horn/Strobes - Functional Test. ... Megger Test Feeders. Torque Feeder/Breaker Lugs. T-Bar. Service. Temporary ...

http://www.ehs.berkeley.edu/sites/default/files/lines-of-services/fire-prevention/ConstructiInspection%20Checklist.IS20150615.docx

Date added: August 27, 2016 - Views: 1

doc
Domestic Hot Water Heat Maintenance Tracing

The heater circuit shall be continuous and megger readings shall be at least 1000 megohm regardless of the heater ... submit separate report for each segment, ...

http://www2.mdanderson.org/depts/cpm/standards/specs/div22/22%2005%2033.doc

Date added: August 30, 2016 - Views: 1

doc
www.caldetection.com

A report indicating the success or failure of each test and any recommended ... The heater circuit shall be continuous and megger readings shall be at least 20 ...

http://www.caldetection.com/specifications/raychem/hwat_spec.doc

Date added: September 11, 2016 - Views: 1

doc
PSG Section 16955 - Eaton

SECTION 16955. electrical equipment ... The test report shall include the following: ... Megger at 1000 VDC for 600 volt cable and 500 VDC for 300 volt cable for one ...

http://www.eaton.com/ecm/idcplg?IdcService=GET_FILE&allowInterrupt=1&RevisionSelectionMethod=LatestReleased&noSaveAs=0&Rendition=Primary&dDocName=16955

Date added: August 18, 2016 - Views: 3

doc
DRY-TYPE TRANSFORMERS (1000 VOLT AND LESS)

The transformers shall be designed, ... Type Test each model design and submit report. ... Power frequency withstand voltage test. Insulation resistance (Megger) test.

http://www.sea.siemens.com/us/internet-dms/internet/consultingengineerscomm/general/Docs/26%2022%2013%2063%2000%20LV%20TRANSFORMERS%20NEMA%20Premium%20Efficiency%20K-RATED.doc

Date added: August 18, 2016 - Views: 1

doc
cppd.mpls.k12.mn.us

Megger all feeders. ... Submit test results for each phase of each feeder from the output report files of the tester. Document all readings and submit to the Engineer.

http://cppd.mpls.k12.mn.us/uploads/26_01_26_maintenance_and_testing_of_electrical_systems_-_done.doc

Date added: September 1, 2016 - Views: 1